Kapra Construction Co. was founded in 2001 by  Mr.   Mahmut Kose, architect, PhD., combining his academic and professional experience in construction industry since the early 1990s.  Mr. Kose, who worked as a lecturer and researcher in the Faculty of Architecture at Istanbul Technical University, has submitted numerous papers and articles regarding construction industry and presented his PhD thesis on “Strengthening of reinforced concrete structures”.

Ruzgarlibahce Mah.  Cinar Sok.  Demirtas Plaza No:3  Kat:4 Kavacik Beykoz  34810 Istanbul Turkey

Phone   : +90 216 6802890

Fax       : +90 216 6802895

e-mail: kapra@kapra.com.tr

KAPRA has been serving in almost all forms of contracts including site evaluation and feasibility, architectural and engineering designs, structural reinforcement, construction and consultancy covering substructure and superstructure of industrial, commercial and residential projects.  Kapra has successfully completed over 300.000 square meter of construction projects as of December 2006.

   

A structural reinforcement application.

KAPRA has been guided by basic tenets for providing all its services at highest standards owing to its institutional, well organized structure and highly experienced human resources.  The quality and reliability of the company has been certificated with ISO 9001 Quality Management System, OHSAS 18001 Occupational Health and Safety Assessment Series and  ISO 14001 Environmental Management System.   Above mentioned systems and documents were granted  for all activities of company including company headquarter and construction sites.

Our motto for every single project in any size is “on-time and on-budget, beyond the quality expectations of client

 



The basic tenets of KAPRA are based on the quality oriented approach to design, production, construction and project management to achieve the contract goals. Our motto for every single project in any size is “on-time and on-budget, beyond the quality expectations of client.”
 



Environmental and occupational safety and security problems are being defined on every project carried by us. All risk factors are deeply analyzed by our safety engineers as per their experience, laws and regulations in force to prevent accidents and minimize risks for employees, subcontractors, visitors and environment. All efforts toward the attainment of ultimate safety on projects we manage grant us a distinctive place before our clients.


KAPRA’s training and educational program assures that all employees embrace the safety philosophy of the company.
 

KAPRA has moved a step ahead of competition through employee training programs, investments on machinery and equipments, and its policy of considering all clients, subcontractors, contractors and vendors as solution providers.




WORK  PRINCIPLES
 


To obey laws and regulations and to save the environment and nature in all activities,

To increase the productivity of employees by providing encouragement and opportunities to improve their skills, creativity and confidence to reach their potential,

To be fair in relations with employees, subcontractors, vendors and all other related parties for mutual benefits,

To grow continuously for providing service continuity, to make investment for growing and to allocating resources for investment,

To be reliable and honest, maintain privacy and social responsibility,

To achieve quality goals with minimum costs by evaluating specific conditions of every single project,

To form healthy, secure, safe and environment sensitive working culture and strive to keep it lasting,

To complete projects on time, on budget and beyond the quality expectations by assigning qualified and experienced employees.
 

  

   Technical Staff

  Our professional technical staff includes:
· Civil Engineers,
· Architects,
· Construction Technicians,
· Foremen,
· And a site personnel with a number over 250.

  Machinery and Equipment Park


. Yongmao tower crane – year: 2007

· jaso52NS tower crane (mobile) - year: 2006
· FM gru 52 tower crane - year: 2005
· 1760 TCK FM gru tower crane – year: 2007
. 1250 CTY FM GRU tower crane – year:2005
. GC Peineer MK 110 GRU tower crane – year:2007 
· 2006 mobile crane 30t
· Our firm prefers Ford Trucks
 Besides these, various number of: 
Complete vibrator kits
· Concrete polishing machines
· Iron cutting and bending machines and compactors
· Asphalt cutting machines
· Complete HILTI drilling cores
· Total Stations
· Compressors
AND also, scaffoldings with an amount sufficient to cover an area equivalent to 2 Olympic Soccer Fields are available in our machinery park.

Ready-made formworks:
· Heavy Duty Scaffoldings
· PERI domino formworks
· PERI wall formworks
· PERI ready made column formworks
· Intek table formworks
 The total amount of the ready-made formworks within the organization of our company is adequate to cover an area equivalent to the area of 7 Olympic Soccer fields.